Sponsored
News

Soludo Flags Off 10.95KM Igboukwu-Ikenga-Ezinifite-Ekwulobia Road

Sponsored
Sponsored

CHRISTIAN ABURIME

 

Anambra State Governor, Professor Chukwuma Charles Soludo, has flagged-off construction of the 10.95 kilometer Igboukwu-Ikenga-Ezinifite-Ekwulobia Road.

 

Performing the function, Governor Soludo emphasized that the visit is in partial fulfilment of the promise he made.

 

Soludo said, “we have come so the construction work will officially kick off”.

“Road construction is the number one problem in Anambra followed by environmental challenges and flood menace that have already devoured over 7 Local government areas in the State.”

 

“Road construction is very critical and that is why we have declared a state of emergency on Anambra roads.”

“From Nkwo I drove down here and have seen the sufferings the people are passing through when they go to Eke from here.

“We have come to ease the suffering of the people. We are building roads and must ensure we touch every local government in the state.”

“Ikenga cannot boast of one square foot of tarred road. In the spirit of APGA, we are remembering all the communities that have been forgotten, leaving nobody behind.”

 

“We are being our brothers’ keeper and that’s why a community that has never seen a 1km tarred road is being remembered today.

“All these roads we are flagging off in the state, we are paying 50% upfront for all of them.

“This particular road, on or before 12 months, shall be completed.

“Anytime the contractors complete the roads, they shall be fully paid and none shall be owed”, Governor Soludo assured.

The Governor also called on the people to reciprocate the good gesture by supporting the party at all levels.

The Commissioner for Works, Engr Ifeanyi Okoma, said that the Governor is determined to build the road with an expected duration of 12 months and a guarantee of 20 years.

 

The Contractor, Mr Elias Thanos of AG Vision Construction Company, said they are committed to build the roads with drainage and Asphalt which would last more than 20 years and assured that the road will be motorable by next year’s Christmas.

In his brief remark on behalf of the entire people of the area, the Transition Committee Chairman for Aguata, Prince Oforbuike, commended Governor Soludo for remembering Ikenga, one of the 14 communities in Aguata that have no tarred road.

He thanked the Governor for wiping their tears and easing their pains by remembering to fix the road, noting that the road will be of immense benefit to the people of Aguata.

Sponsored
Alinnor Arinze

Recent Posts

UBA’s Total Assets Surge To ₦34.96trn As Operating Income Jumps 12.7% In Nine Months

FUNSHO AROGUNDADE United Bank for Africa (UBA) Plc has demonstrated strong operational momentum and balance…

4 hours ago

Gov. Lawal Puts Rescue Mission In Motion With Fresh Empowerment For Transport Operators

In another major intervention aimed at economic empowerment and poverty alleviation, Governor Dauda Lawal today…

5 hours ago

Nigeria On The Path To Prosperity, Says President Tinubu

President Bola Ahmed Tinubu, on Saturday in Ibadan, said the sacrifices Nigerians had made during…

5 hours ago

Gov. Lawal Commissions Zamfara APC Campaign Office, Distributes 50 Cars, 100 Motorcycles, Bikes, Books

Governor Dauda Lawal has officially commissioned the Zamfara APC Presidential and Gubernatorial Campaign Office, further…

6 hours ago

Oyo State Govt Receives Open Defecation-free Status Certificates For Two LGAS

Oyo State has recorded a major significant development in its sanitation drive, with two Local…

9 hours ago

ONC Special Convention Declares Orashi Zero-Tolerance Zone For Pipeline Vandalism & Illegal Bunkering

Notable Niger Delta socio-cultural group, the Orashi National Congress (ONC) Worldwide has drawn a firm…

9 hours ago
Sponsored