NDPHC Kick-Starts 2nd Phase Of Power Plant Tour

Posted on October 5, 2024

 

The Niger Delta Power Holding Company, NDPHC’s Executive Management, led by the MD/CEO, Engr Jennifer Adighije, has kick-started the second phase of the Power Plant tour with an inspection to the Omotosho II Power Plant. 

The Power Plant, located at Okitipupa, Ondo State, is an open cycle gas turbine Power Plant built to accommodate future conversion to combined cycle gas turbine (CCGT) configuration.

The NDPHC tour further reinforces their commitment to ensure that Power assets are all performing at the optimal level needed to facilitate Nigeria’s industrial and economic development

 

Leave a Reply

Your email address will not be published. Required fields are marked *

Latest News

MRS Oil Nigeria Plc, a prominent player in the Nigerian downstream oil industry, has... Continue
BY MICHAEL AKINOLA  Over the years, excruciating fuel scarcity across the nation was an... Continue
  The President of the Nigeria Pitch awards, Shina Phillips, has yet again described... Continue
KINGSLEY EBERE A jilted 29-year old man, Shedrack Kingsley Egu, has been arrested and... Continue
IZUCHUKWU ADICHIE  In Anambra, the festive spirit is already in full bloom. As the... Continue
  AKINSINDE ADEOLA OYINDAMOLA President Bola Ahmed Tinubu has thrown his weight behind early... Continue
CHRISTIAN ABURIME In a significant move to accelerate the growth and development of Anambra... Continue
The People of Ogun West Senatorial District are currently in widespread jubilation as the... Continue
CHUKA UBAH  All is now set for the outing ceremony (Iputa Ogbo) of Ifemaka... Continue
Apex Niger Delta socio-cultural group, Orashi National Congress, ONC, has congratulated the Rivers State... Continue

UBA

DANGOTE AD

GLO


Access Bank

Twitter

Sponsored