President Tinubu To Commission Gas Infrastructure Projects

Posted on May 3, 2024

In line with his commitment to significantly leverage gas to grow the economy, President Bola Tinubu will commission three critical gas infrastructure projects being undertaken by the Nigerian National Petroleum Company Limited (NNPCL) and partners. 

The projects support the federal government’s effort to grow value from the nation’s gas assets while eliminating gas flaring.

The delivery of the projects was accelerated from the inception of the administration in keeping with the overall objective of deepening domestic gas supply as a critical enabler for economic prosperity.

The projects lined up for commissioning include:

(1) AHL Gas Processing Plant 2 (GPP – 2) – 200mmscf/d

This project is an expansion to the Kwale Gas Processing Plant (GPP – 1), which currently supplies about 130MMscf/d of gas to the domestic market.

The processing plant is designed to process 200MMscf/d of rich gas and deliver lean gas through the OB3 Gas Pipeline.

This additional gas supply will support further rapid industrialization of Nigeria. The plant will also produce about 160,000 MTPA of Propane and 100,000 MTPA of Butane, which will reduce the dependency on LPG Imports.

The AHL Gas Plant is being developed by AHL Limited, an incorporated Joint Venture owned by NNPC Limited and SEEPCO.

(2) ANOH Gas Processing Plant (AGPC) – 300MMscf/d

The ANOH gas plant is an integrated 300MMscf/d capacity gas processing plant designed to process non-associated gas from the Assa North-Ohaji South field in Imo State.

The plant will produce dry gas, condensate, and LPG. The gas from ANOH gas plant will significantly increase domestic gas supply, leading to increased power generation and accelerated industrialization.

The ANOH Gas Plant is being developed by ANOH Gas Processing Company, an incorporated Joint Venture owned by NNPC Limited and Seplat Energy Plc on a 50-50 basis.

(3) ANOH-OB3 CTMS Gas Pipeline Project

The project involves the engineering, procurement, and construction of 36”x23.3km ANOH-OB3 Project.

The Transmission Gas Pipeline will evacuate dry gas from the Assa North-Ohaji South (ANOH) primary treatment facility (PTF) to OB3 Custody Transfer Metering Station (CTMS) for delivery into the OB3 pipeline system.

About 600MMscf/d is estimated to be available from two separate 2 x 300MMscf/d capacity gas processing production trains from AGPC & SPDC JV.

When commissioned, the projects will increase gas supply to the domestic market by approximately 500mmscf/d, creating a better investment climate and promoting balanced economic growth cumulatively.

Leave a Reply

Your email address will not be published. Required fields are marked *

Latest News

REMARKS BY PRESIDENT BOLA AHMED TINUBU AT THE MAIDEN STATE HOUSE PRESS CORPS DINNER,... Continue
The Ogun West Progressive Unity Forum (OWPUF) has dismissed reports suggesting that Ogun West... Continue
Zamfara State Governor Dauda Lawal P.hD was among the dignitaries at the maiden State... Continue
In a major stride towards transforming healthcare delivery, SUNU Health Nigeria Limited, a prominent... Continue
Richard Simanga Ngwenya, a South African-based investment banker and Zimbabwean businessman known for showcasing... Continue
Weeks after his remarks that “unlimited mobile data doesn’t exist, except if you are... Continue
President Bola Ahmed Tinubu has said a free press is essential to democracy while... Continue
  EMMANUEL EZE/Country Director, HP Nigeria Nigeria’s workforce challenge is not a shortage of... Continue
KINGSLEY EBERE  A dispute over marriage and tradition has put the Ikegwuonu family in... Continue
Zamfara State Governor, Dauda Lawal P.hD has rolled out a major public welfare intervention... Continue

UBA


Access Bank

Twitter

Sponsored