Lagos To Close Marine Beach Bridge For Five Months

Posted on May 25, 2020

The Lagos State Government on Sunday announced a plan to effect partial closure of the Marine Beach Bridge, Apapa, to vehicular movement, from May 27 to October 21.

The State Commissioner for Transportation, Dr. Frederic Oladeinde, made the disclosure in a statement in Lagos.

He said that the closure would be to enable repair of the bridge which, he said, was long overdue.

“The repair by the Federal Ministry of Works is long overdue and is vital for the safety of the people of Lagos State, especially motorists that ply the bridge to access different parts of the state.

“Necessary palliative works have been carried out on all alternative routes around the construction site to make them to be in good condition to ease movement during the construction period.

“The repair work, which comprise bearing and expansion joint replacement, is planned to be executed in two phases, with each phase focusing on one lane of the bridge at a time.

“The first phase will be handling the lane inbound Apapa while the second phase will be designated to work on the lane that conveys vehicles outside the axis,” he said.

Oladeinde said that the partial closure of the bridge by Total Gas, inward Apapa, would last for five months.

The commissioner said that the repair was in line with the vision of providing a seamless transportation system in the metropolis.

According to him, motorists inward Wharf Road would be diverted to the other section of the bridge outward Apapa.

Oladeinde said that a contraflow of 200 metres had been designed for vehicles to realign with a proper direction inward Ajegunle or Wharf Road, Apapa.

He said that motorists descending to Total Gas would drive without any hindrance.

The commissioner said that operatives of the Lagos State Traffic Management Authority would be stationed at the construction locations to ease traffic.

Oladeinde appealed to motorists and residents of the area to cooperate with traffic management agencies deployed to the areas.

“The state government expresses its commitment to providing a transportation system that will meet the needs of a larger population in an emerging smart city,” he said.

The News Agency of Nigeria (NAN) reports that the Public Affairs Unit of the State Ministry of Transportation (MOT) had on March 27 announced the closure of the Marine Bridge, partially from March 28 to August 15 for repair.

However, on March 28, the ministry suspended the plan due to the COVID-19 pandemic.

(NAN)

Leave a Reply

Your email address will not be published. Required fields are marked *

Latest News

BY CHRISTY ANYANWU Travel often has a way of confronting our expectations. Sometimes, we... Continue
Dangote Petroleum Refinery and Petrochemicals has clarified its position following recent reports referencing data... Continue
President Bola Ahmed Tinubu, GCFR, has approved a landmark reform that replaces project-by-project negotiations... Continue
The Permanent Chairman of the Southern Nigerian Traditional Rulers Council (SNTRC), Arole Oodua Olofin... Continue
The Oyo State Road Traffic Management Authority (OYRTMA) has commenced the replacement of stolen... Continue
BY ‘KEMI PINHEIRO There are men whose passing is announced by the tolling of... Continue
ADEOLA OGUNLADE  The Ikeja Local Government, under the leadership of the Executive Chairman, Comrade... Continue
The Oyo State Universal Basic Education Board (OYOSUBEB), under the leadership of its Executive... Continue
CAJETAN DUKE  The Imo East (Owerri Zone) Senatorial candidate of the Action Peoples Party... Continue
KINGSLEY EBERE A couple and their four-month-old baby, along with two other young men,... Continue

UBA


Access Bank

Twitter

Sponsored